| TITLE: |
Water Storage Value. |
$250,000 |
| Objective: |
What is the value of surface storage reservoirs for stormwater in the Everglades watersheds? |
|
| End date: |
Sep-04 |
|
| Participants: |
FDEP and SFWMD. |
|
| PIs: |
Wanielista, Nnadi, Yeh, Milon, and Finnoff. |
|
|
|
|
| |
|
|
| TITLE: |
Green Roofs (Task one) |
$15,306 |
| Objective: |
Build and Monitor Stormwater and Energy Systems (total expected contract value is $375,000). Task 2 expected at $150,000 |
|
| End date: |
Aug-04 |
|
| Participants: |
Energy Efficient Housing Center (FSEC), FDEP, and Schenkel Shultz Architects, and Roof Scapes, Inc. |
|
| PI: |
Wanielista |
|
|
|
|
| |
|
|
| TITLE: |
Wekiva Springshed Manual. |
$129,000 |
| Objective: |
Control strategies for maintaining a hydrologic balance |
|
| End date: |
Jun-05 |
|
| Participants: |
FDEP, FDOT, and FDCA. |
|
| PI: |
Wanielista and Yeh |
|
|
|
|
| |
|
|
| TITLE: |
Lake Butler and Stormwater |
$10,000 |
| Objective: |
Determine the sources and extent of stormwater responsible for lake degradation. |
|
| End date: |
Jun-05 |
|
| Participants: |
Orange County and SJRWMD |
|
| PI: |
Wanielista |
|
|
|
|
| |
|
|
| TITLE: |
Proprietary BMP Separation Devices. |
$221,000 |
| Objective: |
Side-by-side comparisons of full scale operating devices. |
|
| End date: |
June, 2005 |
|
| Participants: |
FDEP and Vendors |
|
| PI: |
Nnadi |
|
|
|
|
| |
|
|
| TITLE: |
Green Roofs (Task two) |
$145,840 |
| Objective: |
Build and Monitor Stormwater and Energy Systems (total expected contract value is $375,000). Task 1 (design) completed. |
|
| End date: |
Jul-05 |
|
| Participants: |
Energy Efficient Housing Center (FSEC), FDEP, and Roof Scapes, Inc. |
|
| PI: |
Wanielista and Quigley |
|
|
|
|
| |
|
|
| TITLE: |
Stormwater Controller |
$121,000 |
| Objective: |
Develop a Controller that selects & distributes sources of water. |
|
| End date: |
Aug-05 |
|
| Participants: |
FDEP |
|
| PI: |
McDaniel |
|
|
|
|
| |
|
|
| TITLE: |
Mercury in the Atmosphere |
$45,000 |
| Objective: |
What are wet deposition rates in central Florida and how do they compare to other sites in the State and in the Country? |
|
| End date: |
Jun-06 |
|
| Participants: |
USGS and SJRWMD |
|
| PI: |
Nnadi |
|
|
|
|
| |
|
|
| TITLE: |
Porous Concrete Credit |
$192,000 |
| Objective: |
Using existing porous concrete pavement, determine the infiltration capacities and recommend credits that will maintain a hydrologic and pollutant mass balance. Also construct and monitor two filed test sites. |
|
| End date: |
Jun-06 |
|
| Participants: |
National Ready Mix Concrete Foundation, Rinker Inc., and FDOT. |
|
| PI: |
Chopra, and Wanielista |
|
|
|
|
|
|
|
| |
|
|
| TITLE: |
Stormwater Reuse |
$144,000 |
| Objective |
ID and Management of Health Related Concerns in Reuse |
|
| End date: |
Jun-07 |
|
| Participants: |
FDEP and FDOT |
|
| PI: |
Wanielista |
|
|
|
|
| |
|
|
| TITLE: |
Water Quality Modeling. |
$1,400,000 |
| Objective: |
Expand the capabilities of WASH 123 to include basic kinetic principles. |
|
| End date: |
July 2006. |
|
| Participants: |
EPA |
|
| PI: |
Yeh |
|
|
|
|
| |
|
|
| TITLE: |
Regional Facilities |
$181,000 |
| Objective: |
Develop and test alternative methods to remove pollutants from regional ponds before land spreading applications. |
|
| End date: |
August 2007. |
|
| Participants: |
DOT |
|
| PI: |
Wanielista |
|
|
|
|
|
|
|
|
|
|
| |
|
|
| TITLE: |
Loxahatchee River Modeling |
$340,000 |
| Objective: |
Develop a model to predict the salt wedge movement from both groundwater and stormwater river flows. |
|
| End date: |
July 2006 and September 2006. |
|
| Participants: |
FDEP and SFWMD. |
|
| PI: |
Yeh and Hagen |
|
|
|
|
| |
|
|
| TITLE: |
Seasonal Variability of Near GWTs |
$116,825 |
| Objective: |
Define the SHGWT |
|
| End date: |
Oct-06 |
|
| Participants: |
FDOT and UF |
|
| PI: |
Hatfield and Newman |
|
|
|
|
| |
|
|
| TITLE: |
Alternative Stormwater Sorption Media for Control of Nutrients |
$100,000 |
| Objective: |
Test the sorption media for nutrient removal |
|
| End date: |
Dec. 2007 |
|
| Participants: |
SWFWMD |
|
| PI: |
Wanielista and Chang |
|
|
|
|
| |
|
|
| TITLE: |
Laboratory for Stormwater Research and Testing |
$892,000 |
| Objective: |
Efficiencies of soil and erosion control devices |
|
| End date: |
Dec-07 |
|
| Participants: |
FDOT, FDEP, and Applied Polymer Systems. |
|
| PIs: |
Chopra, Smoot, and Wanielista |
|
|
|
|
| |
|
|
| TITLE: |
State Soil Erosion and Sedimentation Manual |
$150,000 |
| Objective: |
Develop a State Wide Manual and update related publications |
|
| End date: |
May-07 |
|
| Participants: |
FDOT, and HydroDynamics |
|
| PIs: |
Wanielista, Chopra, and Smoot |
|
|
|
|
| |
|
|
| TITLE: |
New Partnerships for Nonpoint Source Pollution |
$316,543 |
| Objective: |
Develop educational materials for public education lcassess and governments to enhance an understanding of nonpoint sources |
|
| Participants: |
FDEP and numerous partners |
|
| Status: |
Completed 6/30/2007 |
|
| PI |
Wanielista, Souto, Marshall |
|
|
|
|
| |
|
|
| TITLE: |
Partnerships: Nonpoint Source Pollution Education |
$553,000 |
| Objective: |
Awareness of causes and solutions, implementation assistance, development of partnerships, and assistance in monitoring. |
|
| End date: |
April, 2008 |
|
| Participants: |
FDEP, SJRWMD, IRL, NEP, City of Cocoa Beach, FSA |
|
| PIs: |
Souto, Wanielista, Marshall |
|
|
|
|
| |
|
|
| TITLE: |
Waste Tires |
$200,000 |
| Objective: |
Use of crumb and chip waste tires for pollution control. |
|
| End date: |
Jul-08 |
|
| Participants: |
FDEP, Seminole County |
|
| PI: |
Wanielista |
|
|
|
|
| |
|
|
| TITLE: |
Sediment Characterization in Lake Okeechobee |
$90,000 |
| Objective: |
Identify the sediment transport in the lake system |
|
| End date: |
Sept. 200 |
|
| Participants: |
SFWMD |
|
| PI: |
Chang |
|
|
|
|
| |
|
|
| TITLE: |
Multi-scale Water Infrastructure Characterization Study Using Remote Sensing |
$138,000 |
| Objective: |
Identify the sediment transport of the lake system |
|
| End date: |
Sept. 2009 |
|
| Participants: |
US Environmental Protection Agency |
|
| PI: |
Chang |
|
|
|
|
| |
|
|
| TITLE: |
Aquifer Storage and Recovery (ASR) Alkalinity, Metal, and Mineral Impacts on Phosphorus Fate and Transport in Lake Okeechobee |
$25,000 |
| Objective: |
Identify the chemicals transport and fate of a coupled well and lake system CERP (Comprehensive Everglades Restoration Program) |
|
| End date: |
Sept. 2009 |
|
| Participants: |
US Army Corp of Engineers and SFWMD |
|
| PI: |
Chang |
|
|
|
|
| |
|
|
| TITLE: |
On-Site Wastewater Treatment |
$1,124,000 |
| Objective: |
Demonstration and documentation of next-generation wastewater treatment systems for nutrient control |
|
| End date: |
Mar-10 |
|
| Participants: |
SJRWMD, Seminole County, FDEP, and FDOH |
|
| PI: |
Chang and Wanielista |
|
|
|
|
| |
|
|
| TITLE: |
Analysis of Predrainage Lake Okeechobee Modeling,” and Upper Everglades |
$20,000 |
| Objective: |
In-situ measurements and lake hydrodynamic modeling |
|
| End date: |
Sept. 2010 |
|
| Participants: |
SFWMD, Seminole County, FDEP, and FDOH |
|
| PI: |
Chang |
|
|
|
|
| |
|
|
| TITLE: |
Denitrification Study beneath Stormwater Infiltration Ponds for Promoting Stormwater Reuse and Drinking Water Quality |
$5,000 |
| Objective: |
Demonstration isotop tracer technique |
|
| End date: |
Dec. 2010 |
|
| Participants: |
UCF Boardman Foundation |
|
| PI: |
Chang and Wanielista |
|
|
|
|
| |
|
|
| TITLE: |
Green Roof Wind and Depth of media |
$300,208 |
| Objective: |
Media, Reuse and monitoring for wind and depth |
|
| End date: |
Sept. 2011 |
|
| Participants: |
FDEP |
|
| PIs: |
Wanielista, Hardin |
|
|
|
|
| |
|
|
| TITLE: |
Nitrogen Transformation - Retention Basins |
$1,000,000 |
| Objective: |
Testing in the Ocala area and with engineered soils |
|
| End date: |
Sept. 2011 |
|
| Participants: |
SWFWMD, FDEP, Marion County, SJRWMD, USGS. |
|
| PI: |
O’Reilly, and Wanielista |
|
|
|
|
| |
|
|
| TITLE: |
Education Outreach |
$240,000 |
| Objective: |
Relationship between urbanization and stormwater programs |
|
| End date: |
Continuing. |
|
| Participants: |
FDEP and EPA |
|
| PI: |
Souto and Wanielista. |
|
|
|
|
| |
|
|
| TITLE: |
Residential Integrated Stormwater and Graywater |
$354,569 |
| Objective: |
Demonstrate environmental benefits in a green building |
|
| Participants: |
FDEP, FSEC, SJRWMD. |
|
| Status: |
Working with industries and SFWMD |
|
| PI: |
Wanielista, Hardin |
|
|
|
|
| |
|
|
| TITLE: |
Inlet Protection Devices |
$160,000 |
| Objective: |
Protocol Development and effectiveness. |
|
| Participants: |
FDOT |
|
| Status: |
Resulted in testing of 8 different brands |
|
| PI |
Wanielista, Hardin and Chopra |
|
|
|
|
| |
|
|
| TITLE: |
Stormwater Harvesting |
$370,000 |
| Objectives: |
Develop in-line filtration methods |
|
| Participants: |
FDOT, FDEP |
|
| Status: |
Reduce nutrient waste load along highway |
|
| PI |
Wanielista |
|
|
|
|
| |
|
|
| TITLE: |
Pervious Pavements installation and strength |
$210,036 |
| Objective: |
Effectiveness and rejuvenation. |
|
| Participants: |
FDOT and vendors |
|
| Status: |
Resulted in testing of 7 different pavements |
|
| PI |
Chopra |
|
|
|
|
| |
|
|
| TITLE: |
Pollution Level due to Use of Fertilizers |
$170,000 |
| Objective: |
Fate under various conditions. |
|
| Participants: |
FDOT and vendors |
|
| Status: |
Helped set BMP credit for low phosphate and slow release fertilizers |
|
| PI |
Chopra |
|
|
|
|
| |
|
|
| TITLE: |
Floating Wetlands for Stormwater Management |
$201,000 |
| Objective: |
Determine credit when used with wet ponds. |
|
| Participants: |
FDOT and vendors |
|
| Status: |
Helped set BMP credit of floating wetland for nutrient removal |
|
| PI |
Wanielista, Chang, and Chopra |
|
|
|
|
| |
|
|
| TITLE: |
Silt Fence Testing |
$120,000 |
| Objective: |
Fate under various conditions. |
|
| Participants: |
FDOT and vendors |
|
| Status: |
Helped set credit for low phosphate and slow release fertilizers |
|
| PI |
Chopra |
|
|
|
|
| |
|
|
| TITLE: |
A Mesocosm Study of “Biohaven” Floating Islands Removal in for Nutrient Stormwater Ponds |
$25,000 |
| |
|
| Objective: |
Determine credit when used with wet ponds. |
|
| Participants: |
Floating Islands Environmental Solutions, Inc., |
|
| Status: |
Helped set credit for “Biohaven” Floating Islands |
|
| PI |
Chang |
|
|
|
|
| |
|
|
| TITLE: |
Florida Stormwater Education and Social Marketing |
$906,022 |
| Objective: |
Conducted Landscaping Social Marketing Study and develop plan for program evaluation |
|
| Participants: |
FDEP, SWFWMD, and numerous partners |
|
| Status: |
Completed 6/30/2011 |
|
| PI |
Souto, Quigley |
|
|
|
|
| |
|
|
| TITLE: |
Multi-scale Water Infrastructure Characterization Study Using Remote Sensing |
$80,000 |
| Objective: |
Assess teleconnection signals of climate change on rainfall and water quality. |
|
| Participants: |
US Environmental Protection Agency |
|
| Status: |
Developed three test site in New England areas |
|
| PI |
Chang |
|
|
|
|
| |
|
|
| TITLE: |
Best Management Practices for Aquatic Restoration in Lakes and Streams |
$80,000 |
| Objective: |
Produce a BMP manual for ecosystem conservation. |
|
| Participants: |
Florida Fish and Wildlife Conservation Commission |
|
| Status: |
Underway |
|
| PI |
Chang, Wanielista, Bohlen |
|
|
|
|
| |
|
|
| TITLE: |
Index Testing Laboratory |
$100,000 |
| Objective: |
Field testing of PAM blocks to develop requisite mixing energy |
|
| Participants: |
FDOT |
|
| Status: |
Resulted in establishment of index lab for soils and materials |
|
| PI |
Chopra |
|
|
|
|
| |
|
|
| TITLE: |
Maintenance Practices of Stormwater Runoffs |
$300,000 |
| for Aquatic Restoration in Lakes and Streams |
|
| Objective: |
Produce a BMP manual for maintenance of stormwater ponds. |
|
| Participants: |
FDOT |
|
| Status: |
Underway |
|
| PI |
Chang, Wanielista, Bohlen |
|
|
|
|
| |
|
|
| TITLE: |
Holistic Evaluation of St. Johns River Basin's Surface Water Restoration Projects |
$300,000 |
| Objective: |
a holistic evaluation and systems analysis of St. Johns River Restoration Programs by providing engineering and applied research support. |
|
| Participants: |
SJRWMD |
|
| Status: |
Underway |
|
| PI |
Madani |
|
|
|
|
| |
|
|
| TITLE: |
Tampa Bay Residential Stormwater Study |
$62,000 |
| Objective: |
Compare stormwater runoff, surface water, and soil nutrient research support. |
|
| Participants: |
Tampa Bay Estuary Program, Applied Ecology, FDEP, EPA and others |
|
| Status: |
Underway |
|
| PI |
Souto |
|
|
|
|
| |
|
|
| TITLE: |
Getting to the Point of Nonpoint Source Pollution |
$279,000 |
| Objective: |
Build capacity for stormwater education by improving the coordination of stormwater education products and quantify evaluation results. |
|
| Participants: |
FDEP, SWFWMD, and numerous partners |
|
| Status: |
Underway |
|
| PI |
Souto |
|
|
|
|
| |
|
|
| TITLE: |
Dog Walking Study |
$24,000 |
| Objective: |
Evaluate the effectiveness of City of Edgewater Dog Waste receptacles and associated education campaign. |
|
| Participants: |
City of Edgewater (Completion 1/31/2012) |
|
| Status: |
Underway |
|
| PI |
Souto, Hinkle |
|
|
|
|
| |
|
|
| TITLE: |
Erosion and Sediment Control BMPs Manual 2.0 |
$126,118 |
| Objective: |
Establish BMP Committee and update manual |
|
| Participants: |
FDOT |
|
| Status: |
Underway |
|
| PI |
Chopra |
|
|
|
|
| |
|
|
| TITLE: |
Field Implementation of PAM Treatment System |
$95,000 |
| Objective: |
Field testing of PAM blocks to develop requisite mixing energy |
|
| Participants: |
FDOT |
|
| Status: |
Underway |
|
| PI |
Chopra |
|